I popped over to Caroline Springs Station on the Ballarat line to see the how the project was going before its opening on the 29th of January next year. The station has been a long time coming and has been faced with more than its fair share of issues all of which has resulted one great big mess.

The station

ptvh1078_caroline_springs_website_impressions_v2d-map11

Construction of half the station was completed months ago. The original design, which is the design showcased on the PTV website, was a single platform on a single line section of track. It was never going to work and when the Regional Rail Link opened and forced the Ballarat line to operate at or beyond capacity, someone at V/Line probably had a little spasm in the Minister’s office and secured costs for duplication of the line to Melton.

With that the station was expanded. The platform that had already been built was widened to become an island platform and the track on the new side is under construction.

img_3093

img_3100

The station will have a set of points at both ends as seen above and below. Hopefully this will allow trains to turn back in both directions during disruptions. The new station will be a very easy place to run train replacement coaches to and from with it being next to the Western Freeway.

img_3091

Vehicle access

The station is in a paddock out of town so you can expect most users to come either by private car or bus. An issue that was evident well before actual construction of the station was announced was the roundabout at Christies Road and the Western Freeway off ramp. During the evening peak the off ramp is jam packed with motorists coming home from Melbourne. They sit through the roundabout and prevent any road user from the south (from the new station) from entering.

But it seems this issue may have been addressed with the addition of a signalised pedestrian crossing at the end of the off ramp with the inclusion of a vehicle sensor on Christies Road. I assume the sensor would activate the pedestrian crossing after a time to stop off ramp traffic and allow station traffic to enter the roundabout.

img_3098

img_3099

img_3097

Foot and cycling access

This could almost be a footnote, coming to this station on foot or by bike would be quite intimidating. First, it is about four kilometres from the town centre to the station.

Second, the shared path is terrible. It is dirty and very close to the road and the hurrying motorists and the truck after truck after truck going to and coming from the Boral Quarry would put off even the most determined walker or cyclist.

img_3096

There is also a shared path heading south from the station to no where, but it had to be cut into to make room for the turning lane. The road was built for the station. Wonderful planning.

img_3095

img_3087

But there is no need to worry, I was probably the only path user this month.